2-12 Um BOPP Metallized Film One Side Zinc Aluminum with Ramp Resistance
Contact Supplier
Product Highlights
- Flexible Customization: Offers flexible customization options to meet specific client requirements.
- Wide Width Options: Available in widths of 45mm, 50mm, 62.5mm, 75mm, and other custom sizes.
- Corona Treated Surface: Features a corona treated side with wetting tension of 38 Mn/M.
- Fast Delivery: Standard lead time is 7-20 days after payment confirmation.
Product Attributes
- Customization
- Available
- Application
- Electronic device, Film for Capacitor Use
- Color
- Dark Grey Metallic Finish
- Model NO.
- BOPP
- Installation Method
- Wound Into Capacitor Core
- Material
- OPP/Pet
- Maximum Voltage
- <10KV
- Thermal Rating
- B 130
- Thickness
- 2.2~15 μm
- UV Protection
- No
- Density
- 0.905±0.005 G/Cm³
- Width
- 45mm/50mm/62.5mm/75mm etc
- ID
- 75mm
- Tensile Strength
- ≥100 (MPa)
- Elastic Modulus
- 2800(MPa)
- Wetting Tension
- 38 Mn/M (Corona Treated Side)
- Break-Down Voltage
- ≥350 V/μm (23ºC, DC)
- Lead Time
- 7-20 Days After Payment Confirmed
- Transparency
- Opaque
- Margin
- 2.0mm/2.5mm/4.0mm etc
- Od
- 175mm/220mm/280mm/320mm etc
- Elongation at Break
- 20~200 %
- Heat Shrinkage
- ≤5% (120ºC, 10min)
- Melting Point
- 172ºC
- Margin Type
- Single, Double, Multiple, Middle, Internal
- Transport Package
- Standard Export Catron Package
- Specification
- Metallized Polypropylene Film
- Trademark
- BSD
- Origin
- China
- HS Code
- 3920109090
- Package Size
- 37.00cm * 30.00cm * 30.00cm
- Package Gross Weight
- 10.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of 2-12 Um BOPP Metallized Film One Side Zinc Aluminum with Ramp Resistance
Find Similar Products
Product Description






Storage
Metallized film should be stored in its original package with temperature 5 - 35ºC and humidity less than 85%RH before using.
Metallized layer is easily oxidized when exposure to moisture. Therefore, the film should be used as soon as possible when opened.
The recommended temperature is 15 -25ºC with humidity less than 60%RH after opening.
With original sealed package, and stored as mentioned above, the storage time can be as following:
•Al metallized film: 12 months from the delivery date.
•Al/Zn Alloy metallized film: As zinc is quite unstable , the storage period (from delivery date) depends on the resistance of the film:
≤10 Ω/: 6 months
10 ~30Ω/: 3 months
>30Ω/: 1month
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR249125". Items marked "" are certified.
Company Profile
Huangshan Safety Electric Technology Co., Ltd., is located in the Huangshan city, which is one of the leading manufacturer and exporter in the field of low voltage electric appliance in China,
We produce circuit breaker (MCB, ELCB, RCCB, RCBO, MCCB),
AC capacitor (low voltage power capacitor, motor run and starting capacitors, lighting capacitors, )
Pushbutton, switches, contactor, indication lamps, distribution box, etc series products, at present, we have more 200 workers and with about 20000 square meters building workshop for the production line,
We have gotten the ISO9001, CCC, , CE, TUV, UL certificate. We produce top quality all along and meet customers' quality requirement,
We have the development department by ourselves, we can offer OEM, ODM service and develop new products every year.
We promise to offer you superior products, favorable price, and timely delivery.
If you are interested in cooperating with us, please feel free to contact with us in your earliest convenience time.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 5 Furong Road, Huangshan Economic Development Zone, Huangshan, Anhui, China
-
Plant Area
- 7236 square meters
-
Number of Employees
- 13
-
Registered Capital
- 2,000,000 RMB
-
Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shanghai Port, Ningbo Port
-
Minimum Order Quantity
- 1 Piece
-
Supply Chain Partners
- 50
Our Production Capability & Technical Expertise
-
Main Products
- Circuit Breakers, Switches, Contactor, Capacitor, Cable Connector, Distribution Box, Terminals, Relay, Indicator Light, Cable Ties
-
Production Lines
- 4
-
Production Machines
- Product Assembling Line
-
QA/QC inspectors
- 2 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Flexible customization
-
R&D Engineers
- 1 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2008-06-10
-
Export Year
- 15 Years
-
Main Markets
- Southeast Asia/ Mideast
-
Repeat Buyers Choice
- 80%~100%
-
Number of Foreign Trading Staff
- 2
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- No
Our Certifications, Standards & Industry Recognition
-
Cooperated with Fortune 500
- No
FAQ
- How can I get the price?
- -We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). -If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quotation.
- What is your lead time?
- -It depends on the order quantity and the season you place the order. -Usually we can ship within 15 days for small quantity and about 30 days for large quantity.
- Can you provide samples ? Are the samples free ?
- -Yes,we can provide samples. Normally,we provide 1-3pcs free samples for test or quality checking. But you have to pay for the shipping cost. If you need many items, or need more quantity for each item, we will charge for the samples.
- What is the shipping method?
- -It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect). Please confirm with us before placing orders.
- How do you make our business long-term and good relationship?
- -We keep good quality and competitive price to ensure our customers benefit ; -We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.
Send your message to this supplier
People who viewed this also viewed
-
US$0.53 / Piece
-
US$0.65 / Piece
-
US$0.65 / Piece
-
US$0.45-1.75 / Piece
-
US$0.45 / Piece
-
US$0.65 / Piece
-
US$0.65 / Piece
-
US$0.45 / Piece
-
US$0.45 / Piece
-
US$0.45 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Film For Capacitor Use
- MPPZn/Al
- 2-12 Um BOPP Metallized Film One Side Zinc Aluminum with Ramp Resistance
Related Categories
Hot Searches
- Plastic Card Factories
- Plastic Electrical Factories
- Plastic Wire Factories
- Plastic Enclosure Factories
- Film Wire
- Ac Film
- Cable Film
- Automobile Film
- Film Circuit
- BOPP Film Bulkbuy